Industrial Architecture
and Corporate Design

We design industrial warehouses, last-mile logistics centers, and technology parks with a focus on spatial efficiency, passive systems, and noble materials. Each plan responds to the demands of commercial real estate development in Argentina.

Request consultation
12,000 m² Warehouse in Zárate
8 ha Córdoba Technology Park
25,000 m² Pilar Logistics Center

Workflow simulations · Energy efficiency plans · Developer forms

Concrete value for your industrial project

Measurable results our clients achieve by working with Jolistark.

Reduction in energy consumption

We design envelopes and passive systems that reduce HVAC demand by up to 35% in warehouses and logistics centers, validated through CFD simulation.

Optimization of operational flows

The layout of docks, aisles, and storage areas reduces maneuvering times by 18% and separates pedestrian and vehicular flows with elevated walkways.

Modular scalability without interruptions

Load-bearing structures that allow internal subdivisions and expansions without affecting existing operations, with clear spans of up to 18 meters.

Reduction in maintenance costs

Steel fiber-reinforced concrete slabs eliminate expansion joints and reduce repairs. Noble materials like Corten steel and polycarbonate extend the replacement cycle.

Regulatory compliance and tight deadlines

Turnkey projects with detailed engineering that ensure municipal approval and startup within the agreed schedule, without deviations.

Automation integration from the design phase

We coordinate the implementation of AS/RS systems, conveyor belts, and synchronized docks during the layout phase, avoiding costly later modifications.

Applied Capabilities

Services that solve real problems of flow, structure, and energy in industrial and corporate projects.

Logistics Flow Simulation

We model the movement of goods and personnel in warehouses and distribution centers to reduce bottlenecks before construction. We validate layouts with real operational data.

Efficient Envelope Design

We calculate thermal loads and select enclosure materials (sandwich panels, exposed concrete, Corten steel) to minimize energy consumption without relying on oversized active systems.

Planimetry for Developers

We deliver site plans, structural sections, and installation schematics ready for submission to municipal and provincial agencies. Includes technical reports justifying each decision.

Modular and Expandable Structures

We design steel frames and post-tensioned slabs that allow future subdivisions without demolition. Each module is designed with clear spans of up to 24 meters to adapt to changing uses.

Passive Systems Integration

We incorporate cross ventilation, thermal mass in slabs, and fixed solar shading as part of the architectural design, not as afterthoughts. Result: reduced load on HVAC equipment.

Industrial Regulation Consulting

We assist developers in obtaining feasibility studies, permits, and energy efficiency certifications. We are familiar with the building codes of the main productive areas of Argentina.

Ready to start your industrial project?

We coordinate a technical review of your program of needs and define the scope of the preliminary project.

Request a feasibility meeting

Recommended Readings

Articles and projects related to industrial architecture and corporate design.

Industrial Warehouse in Zárate: Energy Efficiency and Logistics Flow

Turnkey project for a last-mile distribution center

Analysis of the structural design and passive climate control systems applied in a 12,000 m² warehouse. Loading docks were optimized and airflow distribution was validated through CFD simulation.

Read more

Technology Park in Córdoba: Connectivity and Modular Scalability

Master plan for an 8-hectare corporate campus

Implementation strategy with flexible modules and collaborative spaces. Each module allows internal subdivisions without affecting the load-bearing structure, facilitating adaptation for different companies.

Read more

Logistics Center in Pilar: Automation and Material Flow

Integration of AS/RS systems and synchronized dock design

How spatial distribution and material selection reduced operational costs by 22%. Herringbone dock layout for simultaneous loading and unloading of 18 trucks.

Read more

Cookie settings We use cookies to keep the site stable, remember basic preferences, and understand which pages are useful. You can accept, reject, or review the settings before continuing.

ES EN